Assistant Commandant - Shore

Office of Environmental Management


 

Environmental Planning and Historic Planning

The National Environmental Policy Act (NEPA) requires all Federal agencies to consider the impacts of proposed actions on the human environment and involve the public in the NEPA process. The Environmental Planning and Historic Preservation (EPHP) Team publishes all Environmental Impact Statements and Environmental Assessments of regional or national significance for public notice and comment. Interested parties can view recent draft and final NEPA documents below. Contact information for each project are included in each posting.

On April 23, 2019, SHORE-V released the U.S. Coast Guard Environmental Planning Policy, COMDTINST 5090.1 (series) (EP CI) and the Environmental Planning Implementing Procedures (EP IP).  The EP CI mandates the use of the EP IP.  The two documents now align with the DHS NEPA policy, Implementation of the National Environmental Policy Act, Department of Homeland Security Instruction Manual 023-01-001-01 (series) and replace the old Coast Guard National Environmental Policy Act (NEPA) Implementing Procedures and Policy for Considering Environmental Impacts, COMDTINST 16475.1D, which has been cancelled. The EP CI and IP include significant changes to the Coast Guard environmental planning process and provide improved policy and procedures for complying with both NEPA and Environmental Effects Abroad of Major Federal Actions, Executive Order (EO) 12114.  Coast Guard members engaged in environmental planning efforts or taking actions that trigger NEPA or EO 12114 requirements must read both the EP CI and IP in order to implement their requirements effectively.  Significant changes from COMDTINST M16475.1D included in the EP CI and IP include but are not limited to:

  • Policy and procedures on the requirements of EO 12114.
  • Pre-planning process and notification requirements for NEPA and EO 12114.
  • Timing of compliance with other related environmental mandates (ESA, NHPA, etc.).
  • Requirements to track and report mitigation and monitoring commitments.
  • Requirement to establish formal agreements for providing environmental planning support.
  • Specific guidance for both the acquisitions and shore facilities management programs

Policy Documents

USCG Environmental Planning Policy, COMDTINST 5090.1

Environmental Planning Implementing Procedures for COMDTINST 5090.1 Environmental Planning Policy (updated Feb 2025)

Results:
Tag: FONSI

Default Coast Guard Logo

Aug. 28, 2026

South Padre Island Environmental Assessment and Finding of No Significant Impact

The Coast Guard announces the signing of the Finding of No Significant Impact for the United States Coast Guard Station South Padre Island (STA SPI).   The Coast Guard's purpose and need for the Proposed Action is to build and operate modern, secure facilities at STA SPI to protect the U.S. maritime border and fully support current and future Coast

Default Coast Guard Logo

Aug. 13, 2026

Final Environmental Assessment and Finding of No Significant Impact for the Recapitalization of Waterfront Facilities at Station Rockland, Maine

The U.S. Coast Guard (USCG) has prepared a Final Environmental Assessment (FEA) and Finding of No Significant Impact (FONSI) for the proposed recapitalization of waterfront facilities at Station Rockland in Knox County, Maine. The proposed recapitalization is necessary to restore the waterfront facilities that were damaged by historic storms and

Default Coast Guard Logo

July 31, 2026

Final Environmental Assessment and Finding of No Significant Impact for the Recapitalization of Waterfront Infrastructure at U.S. Coast Guard Sector Jacksonville Annex, Florida

The U.S. Coast Guard (USCG) has prepared a Final Environmental Assessment (FEA) and Finding of No Significant Impact (FONSI) for the proposed recapitalization of waterfront infrastructure at USCG Sector Jacksonville Annex in Atlantic Beach, Florida. The proposed recapitalization of shoreside and landside facilities is necessary to accommodate

Default Coast Guard Logo

July 13, 2026

Final Environmental Assessment and Finding of No Significant Impact for the Recapitalization of Moorings and Facilities at Sector St. Petersburg, Florida

The U.S. Coast Guard (USCG) has prepared a Final Environmental Assessment (FEA) and Finding of No Significant Impact (FONSI) for the proposed recapitalization of moorings and other facilities at Sector St. Petersburg in Pinellas County, Florida. The proposed recapitalization of moorings and facilities at Sector St. Petersburg is necessary to

Default Coast Guard Logo

June 2, 2026

Final Environmental Assessment and Finding of No Significant Impact for the Station Tillamook Bay Replacement of Haul-Out Pier and Boathouse at Garibaldi, OR

The U.S. Coast Guard (USCG) has prepared a Final Environmental Assessment (FEA) which examined the potential impacts for the proposed waterfront improvements at Station Tillamook Bay in Garibaldi, OR. The Proposed Action is needed to ensure optimum readiness and enable the USCG to safely perform its mission within its Area of Responsibility from

Default Coast Guard Logo

May 28, 2026

Final Environmental Assessment and Finding of No Significant Impact for the ANT Saugerties Relocation Project at Kingston, NY

The U.S. Coast Guard (USCG) has prepared a Final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for the Aids to Navigation Team (ANT) Saugerties Relocation Project at Kingston, NY. The EA examines the potential impacts for the proposed project to relocate ANT Saugerties from Saugerties, NY, to a former industrial

Default Coast Guard Logo

April 28, 2026

Final Environmental Assessment and Finding of No Significant Impact for the Waterways Commerce Cutter Homeport and Maintenance Facility and Waterfront Facility Improvements at St. Louis, MO

The U.S. Coast Guard (USCG) has prepared a Final Environmental Assessment (FEA) which examined the potential impacts for the proposed waterfront improvements at the Waterway Commerce Cutter Homeport and Maintenance Facility in St. Louis, MO. The project’s purpose is to accommodate incoming Waterways Commerce Cutter (WCC) River Buoy Tenders (WLRs)

Default Coast Guard Logo

April 23, 2026

Construction of HC-130J Temporary Hangars at Air Station Barbers Point, Kapolei, O'ahu, Hawai'i

The U.S. Coast Guard proposes to construct new, temporary hangars for HC-130J fixed-wing aircraft with supporting facilities and utilities at the Coast Guard Air Station Barbers Point (ASBP) near Kapolei, O'ahu, Hawai'i. As an interim hangaring measure pending construction of a long-term permanent structure, the Coast Guard proposes to construct up

Default Coast Guard Logo

Feb. 3, 2026

Final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) – New Work Dredging, Cutter EAGLE, New London City Pier, New London, CT

This document provides the final environmental analysis and decision regarding the dredging operations at the New London City Pier to support the Eagle.  The assessment concludes that the project will have no significant effect on the human environment. The EA details the alternatives considered, the preferred alternative, and the environmental

Default Coast Guard Logo

Jan. 29, 2026

Final Environmental Assessment for Recapitalization of Base Kodiak Potable Water Distribution System

The U.S. Coast Guard (USCG) is publishing the final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for the Recapitalization of Potable Water Distribution System at Base Kodiak Alaska. The Coast Guard has found that the Proposed Action would have no significant impacts.  The Coast Guard will implement the Proposed